Price Range and Availability
|
| |
| Lake View Enclave Phase I |
Lake View Enclave is only 4.8 kms from Ravi Nagar Square
on the Amravati Main Road which connects the city to
Pune and Mumbai. The closest land mark to this is Water
Tank 100 mts. on the left hand side after the Octroi
Naka on the Amravati Road. The Phase I is complete with
some families already started to live there and the Phase II
is expected to get completed by July 2009 (Tower 5) and
October 2009 (Tower 6). The project is
pre-approved by HDFC Ltd. and other leading financial
institutions for Home loans.
The price range (valid only upto 30th November 2008) and
availability in Lake View Enclave – Phase I is as
follows: |
| Phase I - Ready Possession |
| Type |
Location |
Size (sq.ft.) |
Availability |
Pricing |
| 2 BHK |
Tower 1 |
908.02 |
(6th floor) |
21.65 Lacs |
| |
Tower 2 |
947.26 |
(1st, 6th floor) |
22.55 Lacs |
| 3 BHK |
Tower 2 |
1,289.52 (Note 1) |
(6th floor) |
42.70 Lacs |
| 4 BHK |
Tower 1 |
1,813.55 |
(1st, 3rd, 5th floor) |
43.20 Lacs |
| Tower No. 1 has Pent House option on the 6th Floor as follows: |
| 3 BHK |
1157 sq.ft. + Terrace 389.01 sq.ft. on the same level + Terrace 1,000 sq.ft. on top |
38.60 Lacs |
|
|
Note 1: This flat is a ready to move in flat with complete interiors. The cost of Furnishing is included in this price.
|
|
Covered Car parking is available on the ground floor of
each building at an additional charge of 40,000. Stamp
Duty, Registration Charges will be approx. 3% of the
cost. Security Deposit for Individual MSEB Meter – Rs.
6,500. Payment terms for Phase I is:
|
| Booking |
10.00% |
| November-2008 |
90.00% |
|
| |
| Lake View Enclave Phase II |
|
Lake View Enclave is only 4.8 kms from Ravi Nagar Square
on the Amravati Main Road which connects the city to
Pune and Mumbai. The closest land mark to this is Water
Tank 100 mts. on the left hand side after the Octroi
Naka on the Amravati Road. The Phase I is complete with
some families already started to live there and the Phase II
is expected to get completed by July 2009 (Tower 5) and
October 2009 (Tower 6). The project is
pre-approved by HDFC Ltd. and other leading financial
institutions for Home loans.
The price range (valid only upto 30th November 2008) and
availability in Lake View Enclave – Phase II is as
follows:
|
| Phase II - Under Construction |
| Type (BHK) |
Tower |
Size (sq.ft.) |
Availability (as on Date) |
Pricing (In Lacs) |
| 2 BHK |
Tower 5 |
939.23 |
(302 / 502 / 602 / 605) |
22.40 |
| 3 BHK |
Tower 5 |
1,247.05 * |
(601)
(103 / 203 / 303 / 403 / 503 / 603)
(304 / 404 / 504 / 604)
(506 / 606)
|
29.70-31.90 |
| |
Tower 6 |
1,198.44 * |
(103* / 203 / 303 / 403 / 503 / 603) |
28.55-29.45 |
| |
Tower 6 |
1,200.30 * |
(106* / 206 / 406 / 506 / 606) |
28.60-29.50 |
| |
Tower 6 |
1,275.77 * |
(201 / 401 /
601) |
30.40 |
| |
Tower 6 |
1,277.02 * |
(202 / 302 / 402 / 502 / 602) |
30.40 |
| |
Tower 6 |
1,328.54 * # |
(205# / 305 / 405 / 505 / 605) |
31.65-41.25 |
| |
Tower 6 |
1,333.97 * # |
(104* / 204# / 404 / 604) |
31.75-41.40 |
| * First Floor has Terrace Options # Second Floor also has Terrace Options |
| Tower No. 6 has Pent House options on the 7th Floor as follows: |
| 3 BHK |
1342 sq.ft. + Terrace 445.03 sq.ft. on the same level (T-6 - 701) |
35.50 |
| 3 BHK |
1343 sq.ft. + Terrace 438.82 sq.ft. on the same level (T-6 - 702) |
35.50 |
| 3 BHK |
1397 sq.ft. + Terrace 418.50 sq.ft. on the same level (T-6 - 704) |
36.60 |
| 3 BHK |
1403 sq.ft. + Terrace 416.61 sq.ft. on the same level (T-6 - 703) |
36.70 |
|
|
Covered Car parking is available on the ground floor of each
building at an additional charge of 40,000. Stamp Duty,
Registration Charges will be approx. 3% of the cost.
Security Deposit for Individual MSEB Meter - On Actuals.
Payment schedule for Phase II is as follows:
|
| Tower 5 |
| November-2008 |
10.00% |
| 10-Dcember-2008 |
5.00% |
| 10-January-2009 |
59.50% |
| 10-February-2009 |
4.25% |
| 10-March-2009 |
4.25% |
| 10-April-2009 |
4.25% |
| 10-May-2009 |
4.25% |
| 10-June-2009 |
4.25% |
| July-2009 |
4.25% |
|
| Tower 6 |
| November-2008 |
10.00% |
| 10-December-2008 |
5.00% |
| 10-January-2009 |
46.75% |
| 10-February-2009 |
4.25% |
| 10-March-2009 |
4.25% |
| 10-April-2009 |
4.25% |
| 10-May-2009 |
4.25% |
| 10-June-2009 |
4.25% |
| 10-July-2009 |
4.25% |
| 10-August-2009 |
4.25% |
| 10-September-2009 |
4.25% |
| October-2009 |
4.25% |
|
|
|